| a.) |
Electric Power |
| |
Charges for residential, commercial and industrial areas shall be in accordance with local current electric rates plus 10% maintenance and service fees. |
|
| b.) |
Telephone (per unit) |
| |
Commercial |
P 225.00/month |
|
| |
Extension |
75.00/month |
|
| |
Residential |
P 100.00/month |
|
| |
Extension |
50.00/month |
|
| |
Cable repairs per line (house cable) |
35.00/month |
|
| |
Deposit for telephone set |
1,000.00/set |
|
|
| c.) |
Water Charges |
| |
Leases and/or tenants of buildings and/or spaces shall be charged for their water consumption based on the actual meter reading in accordance with local water rates plus 10% maintenance and service fee. |
|
| d.) |
Leases and/or tenants of buildings and/or spaces with centralized air-conditioning shall be charged for their air-conditioning privileges based on actual air-conditioning consumptions of the building divided by the square meter of floor area covered plus 10% service fee. |
|
| e.) |
Right-Of-Way for telephone, teletype, cable pairs, video monitors and antenna system: P115.00. |
| f.) |
For the installation/connection of utilities such as electrical, water and telephone, a per unit fee shall be charged as follows: |
| |
1. Commercial |
P 180.00 |
|
| |
2. Residential |
P 90.00 |
|
|
| g.) |
Construction, repair, renovation of improvement of building and similar structures within, a permit fee shall be charged as follows: |
| |
1. Commercial |
P 150.00 |
|
| |
2. Residential |
P 75.00 |
|
|
| g.) |
Height Clearance Permit - A fee of P50.00 shall be charged to each application for height clearance permit. |